Q1. What is an electric actuated ball valve used for, and where is it used?
A1. A ball valve isolates or switches flow with a quarter turn of a bored ball. It is used wherever the valve is operated often or has to be operated quickly and visibly: on-off duty on water, oil, gas and chemicals, at the inlet and outlet of instruments and small pumps, on manifold and sampling points, on filling and emptying connections, and on gas lines where a tight seal matters. Compared with a gate valve the advantages are speed, a seal made by a seat that wipes itself as the ball turns, and no cavity in line with the flow. The limits come from the seat material: the polymer seats that give bubble-tight shut-off set a temperature ceiling, and the bore through the ball adds a small pressure loss that a full-bore design is used to avoid. With an electric actuator it is used on lines operated remotely or by a sequence, and on sites where no air supply is available for a pneumatic actuator.
Q2. What design variants are available, and how do I tell them apart?
A2. Two design families matter. A floating ball is pressed against the downstream seat by the line pressure itself; it is simple, seals well in the smaller sizes and is the usual choice up to about DN200. A trunnion-mounted ball is supported top and bottom in bearings so the seats are loaded by a spring rather than by the line, which is what allows large sizes and high pressure to be handled with a low operating torque. Body construction is one-piece, two-piece or three-piece, the choice being driven by whether the valve must be serviced in line. Port can be full bore or reduced, and the seat is either soft or metal.
Q3. What settings have to be checked when an electric actuator is commissioned?
A3. Four settings decide whether the valve survives. The torque limit — set it to the figure the valve actually needs, because a limit high enough to close a stiff valve is also high enough to damage the seat. The open and close limit switches — verify them at the valve rather than on the actuator alone, since a switch set on actuator travel can leave the valve short of full open or full closed. The stroking time, where a figure is specified, because it protects the line as much as the actuator. And the fail-safe action — test it by removing the supply rather than by reading the drawing. Record all four in the maintenance file; the next person to work on the valve will not know what was agreed at order stage.
Q4. How does it compare with the alternative valve types on the same line?
A4. Choose by duty first and by price second. Isolation over long periods with low loss points at a gate or a ball valve; frequent on–off points at a ball valve; flow regulation points at a globe or a control valve; tight shut-off on gas at a soft-seated ball; and space-constrained large lines point at a butterfly. The cost comparison only becomes meaningful once the duty is fixed, because the cheapest valve of the wrong type is the expensive one.
Q5. What are the common failure modes, and how are they avoided?
A5. A valve that fails early usually fails for one of four reasons: it was selected on the normal condition and then met the extreme one, it was installed against the flow arrow, it was used for a duty it was never designed for such as throttling or as the sole isolation point, or it was commissioned without the pipework being cleaned. Only the first of those is a selection issue; the other three are found on site, which is why the installation checks matter as much as the specification.
Q6. How do I select the right one for my line?
A6. Selection starts from the service, not from the catalogue. Fix the medium and its concentration first, because that decides the body material and the seating. Then the design pressure and the design temperature together, since the allowable pressure at temperature is lower than the cold rating and it is the hot figure that governs. Then the size, the connection, and how often the valve will be operated, which is what decides between a handwheel, a gearbox and an actuator. Bring those five answers to the enquiry and the rest of the selection follows from them.
Q7. How do I order, and what information is needed for a quotation?
A7. Ordering starts from the line list: tag number, size, class, medium, temperature, connection and operating method. Send that and we will confirm material and seat selection against the medium, flag anything that is likely to cause trouble on site, and quote accordingly. Special sizes, operators and materials are produced to order.