Tashkent Region, Central Uzbekistan · Thermal System Valves for a Combined-Cycle Power Plant
Client Background & Pain Points A combined-cycle power plant (CCGT) in central Uzbekistan was expanding its units and required power plant valves for its thermal systems. The client was a local power company and the engineering was carried out by a regional engineering contractor. Winter temperatures at the site are low while the steam system […]