Chemical Industry
Client Background & Pain Points A chemical company carried out a revamp of an intermediate plant in the petrochemical area of Bahia, northeast Brazil, replacing chemical plant valves on corrosive-media lines. The client was a local chemical company and the engineering was carried out by a Brazilian local engineering firm. The media contain organic acids, […]
Client Background & Pain Points A multinational petrochemical operator’s facility on the Gulf of Mexico coast entered a planned turnaround window and needed a petrochemical turnaround valves package for Mexico, replacing a batch of process and utility valves nearing end-of-life; the EPC was carried out by a local maintenance contractor. The turnaround window was fixed […]